Lock-up inspection in Strathtulloh

Lock-up is when the roof is on, the windows are in and the house can be closed. It is the last look at framing, sarking and services before plasterboard covers the walls.

  • Roof, windows and brickwork in, plasterboard not yet delivered
  • 1 to 2 hours on site
  • Report within 24 hours
Request your quoteSend your details and a local inspector will ring you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage4 of 7
When to bookRoof, windows and brickwork in, plasterboard not yet delivered
Time on site1 to 2 hours on site
Inspected againstAS 3700 (masonry), AS 4773, AS 2047 (windows), NCC Part 3.5 roof and wall cladding, manufacturer flashing details

What is included in a Strathtulloh lock-up (pre-plaster) inspection

  • Wall wrap and roof sarking coverage, laps and tears
  • Head, sill and jamb flashings to every window and door
  • Weep holes clear and correctly spaced
  • Articulation joints and cavity clearance
  • Mortar joints, brick ties and bed joint reinforcement
  • Lintels over openings and their bearing
  • Roof battens, tile or sheet fixing and ridge details
  • Valleys, penetrations and box gutter supports
  • Roof space insulation, sarking and services
  • Exhaust and rangehood ducting runs
  • External cladding fixing and clearance to ground
  • Garage, porch and alfresco set-downs
  • Site drainage and grading before landscaping
  • Debris and mortar droppings at the slab edge
Why it matters here

Lock-up (pre-plaster) inspections on Strathtulloh builds

Later trades are the risk at this stage. Plumbers and electricians cut through bracing to run their lines, roofers leave cracked tiles, and nobody tapes the sarking they tore. Each of these is a quick fix with the walls open and an expensive one once they are lined.

What we find at this stage in Strathtulloh

  • Bracing cut through by a later trade
  • Cracked or slipped roof tiles
  • Torn sarking and unsealed roof penetrations
  • Anti-ponding boards missing at the eaves
  • Door frames out of plumb
  • Floors out of level beyond tolerance
Torn sarking in several places that needs taping before linings go up, Strathtulloh
Torn sarking in several places that needs taping before linings go up
Wall packers used to straighten studs left without proper fixings, Strathtulloh
Wall packers used to straighten studs left without proper fixings
Truss bearing too far off the stud on a single top plate, Strathtulloh
Truss bearing too far off the stud on a single top plate
Sample findings

Sample defects found during our lock-up (pre-plaster) inspections in Strathtulloh

Annotated findings from Lock-up (pre-plaster) inspections.

Structural bracing cut through by a later trade, needing repair and engineer sign off, found during a lock-up inspection in Strathtulloh
Structural bracing cut through by a later trade, needing repair and engineer sign off
Cracked roof tile on a brand new roof that will let water through, found during a lock-up inspection in Strathtulloh
Cracked roof tile on a brand new roof that will let water through
Sarking left unsealed around a roof penetration, a direct path for water, found during a lock-up inspection in Strathtulloh
Sarking left unsealed around a roof penetration, a direct path for water
Anti-ponding board missing at the eaves under a sarked tile roof, found during a lock-up inspection in Strathtulloh
Anti-ponding board missing at the eaves under a sarked tile roof

The other stages of a Strathtulloh build

  1. Bored piers inspection in Strathtulloh1Bored piersWith the piers drilled and the cages lowered in, before the concrete truck arrives
  2. Slab pre-pour inspection in Strathtulloh2Slab pre-pourOnce steel, pods and membrane are complete, the day before concrete
  3. Frame inspection in Strathtulloh3FrameWith trusses fixed and before wall wrap or roof sarking closes it in
  4. Fixing inspection in Strathtulloh5FixingLinings, doors and joinery in, painter not yet started
  5. Waterproofing inspection in Strathtulloh6WaterproofingMembrane cured, tiler not yet on site
  6. Pre-handover (PCI) inspection in Strathtulloh7Pre-handover (PCI)When the builder calls practical completion, before you sign or pay the final claim

All construction stage inspections in Strathtulloh →

Guides

Construction stage guides for Strathtulloh

All guides →

Book a lock-up (pre-plaster) inspection in Strathtulloh

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Lock-up (pre-plaster) inspections in Strathtulloh: common questions

What does a lock-up inspection cover?

The roof covering and sarking, window and door installation, framing changes since frame stage, wall packers, bracing, and the readiness of the house for plaster.

Why look at bracing again?

Because it is often damaged after the frame inspection, when services go in. A cut brace needs repair and engineer sign off before it disappears.

Does the inspector get onto the roof at lock-up?

Where it is safe, or we use a drone and ladder views. The report notes how the roof was inspected.

What about insulation?

We check that wall and ceiling batts are installed where they are due at this stage and note gaps.

Do you treat lock-up and pre-plaster as one visit?

Many builders combine the two, and our visit covers both: the closed-in shell and the framing just before lining.

How long is the visit?

Usually around two hours.