A slab pre-pour inspection checks the waffle pods, beams, steel and vapour barrier while all of it is still exposed, the day before the concrete is placed.

  • Once steel, pods and membrane are complete, the day before concrete
  • About 1 hour on site
  • Report within 24 hours
Request your quoteSend your details and a local inspector will ring you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage2 of 7
When to bookOnce steel, pods and membrane are complete, the day before concrete
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, NCC Part 3.2, the engineer's slab design and the soil report

What is included in a Strathtulloh slab pre-pour inspection

  • Slab class and layout checked against the engineer's design and the soil report
  • Edge beam and internal beam depths and widths
  • Reinforcement size, spacing, laps and trench mesh
  • Bar chairs, cover and support so steel does not sit on the ground
  • Waffle pods, void formers and pod spacing
  • Vapour barrier coverage, laps and tape at penetrations
  • Plumbing and electrical penetrations and sleeves
  • Set-downs for wet areas, garage, porch and alfresco
  • Termite management components installed before the pour
  • Formwork alignment, level and set-out against the plans
  • Stormwater pipe cover and pit positions where visible
  • Site cut, fill and pier holes where visible
  • Hot water service and meter box slab extensions formed
  • Trench cleanliness and debris before the pour
Why it matters here

Slab pre-pour inspections on Strathtulloh builds

Strathtulloh slabs sit on basalt plains clay that swells when wet and shrinks when dry. A slab built to its engineering copes with that; one with pinched beams, sagging mesh or a holed membrane is weaker exactly where the ground pushes hardest.

What we find at this stage in Strathtulloh

  • Pods shifted so internal beams are narrower than designed
  • Mesh resting low because bar chairs are missing
  • Holes in the vapour barrier left without a patch
  • Membrane stopping short of the beam base
  • Pipes through the membrane with no sleeve or tape
  • Steel touching pipes where a gap is required
Mesh touching service pipes where a 25mm gap is needed, Strathtulloh
Mesh touching service pipes where a 25mm gap is needed
Beam stem narrower than the 250mm minimum on the engineering, Strathtulloh
Beam stem narrower than the 250mm minimum on the engineering
Beam narrowing where pods shifted and no spacers were placed, Strathtulloh
Beam narrowing where pods shifted and no spacers were placed
Sample findings

Sample defects found during our slab pre-pour inspections in Strathtulloh

Annotated findings from Slab pre-pour inspections.

Holes in the vapour barrier left without a polyethylene patch and tape, found during a slab pre-pour inspection in Strathtulloh
Holes in the vapour barrier left without a polyethylene patch and tape
A waffle pod squeezing an internal beam to 30mm where 110mm was designed, found during a slab pre-pour inspection in Strathtulloh
A waffle pod squeezing an internal beam to 30mm where 110mm was designed
Vapour barrier stopping short of the beam base instead of running to ground, found during a slab pre-pour inspection in Strathtulloh
Vapour barrier stopping short of the beam base instead of running to ground
Plumbing pipe passing through the membrane with no sleeve or tape seal, found during a slab pre-pour inspection in Strathtulloh
Plumbing pipe passing through the membrane with no sleeve or tape seal

The other stages of a Strathtulloh build

  1. Bored piers inspection in Strathtulloh1Bored piersWith the piers drilled and the cages lowered in, before the concrete truck arrives
  2. Frame inspection in Strathtulloh3FrameWith trusses fixed and before wall wrap or roof sarking closes it in
  3. Lock-up (pre-plaster) inspection in Strathtulloh4Lock-up (pre-plaster)Roof, windows and brickwork in, plasterboard not yet delivered
  4. Fixing inspection in Strathtulloh5FixingLinings, doors and joinery in, painter not yet started
  5. Waterproofing inspection in Strathtulloh6WaterproofingMembrane cured, tiler not yet on site
  6. Pre-handover (PCI) inspection in Strathtulloh7Pre-handover (PCI)When the builder calls practical completion, before you sign or pay the final claim

All construction stage inspections in Strathtulloh →

Guides

Construction stage guides for Strathtulloh

All guides →

Book a slab pre-pour inspection in Strathtulloh

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Slab pre-pour inspections in Strathtulloh: common questions

What does a slab inspection cover?

Beam and stem widths, steel size and position, bar chairs and cover, the vapour barrier and its taping, set-downs, and the clearance between steel and service pipes.

Why do beam widths matter?

The engineer sized each beam for your soil. A pod that slides sideways can cut a 110mm beam down to a fraction of that, and the concrete simply fills the smaller space.

Can the builder fix things before the pour?

Nearly always. Moving pods, adding chairs and taping the membrane are quick jobs when they are pointed out early.

Which standard covers slabs?

AS 2870 for residential slabs and footings, the Housing Provisions for the vapour barrier, and the engineering drawings for your lot.

Do you need the engineering drawings?

Yes. Beam sizes, steel and set-downs are all specific to your design and can only be checked against it.

How long does it take?

About an hour to an hour and a half for a typical single storey slab.